Hello,
I would soon like to be able to have an electric vehicle charger in my parking space, or parking number [insert your parking number]. After some research, I found that the configuration of the electrical infrastructure for this building requires an energy capacity assessment before moving to an installation.
I’d like to know if the board has previously taken any action on this matter? If not, we could start by doing a survey to assess the general interest in installing electric vehicle charging stations.
Here is a page that explains what to do in the context of inaccessible meters: https://murbly.com/en/resources/infrastructure-upgrades-for-inaccessible-meters
Regards,
[Your name]
[Your complete address]